General Contractors
The glazing package bid, permitted, installed, and closed out as one subcontract.
WINDOWLADY
Multi-Family & Commercial
Full-envelope impact retrofits phased so residents never have to leave.
Association & Property Managers
Unit-by-unit scope, phasing plan, per-unit and per-stack pricing, and renderings you can present at a members' meeting.
Product approvals (NOA), structural calculations, threshold inspections, and 40/50-year recertification coordination for HVHZ compliance.
Phased schedules by stack or floor, elevator and staging protocols, daily dry-in, protective floor and furniture covering, and unit-level resident notices.
One contract covers survey, engineering, permitting, material, installation, and inspection sign-off — no split responsibility between supplier and installer.
Complete permitting, inspection, and wind-mitigation documentation for Florida insurance credits building-wide.

Scope
The glazing package bid, permitted, installed, and closed out as one subcontract.
Community-wide programs and one-off homes under the same contract terms.
Full-envelope scope carried from award through certificate of occupancy.
Full-envelope retrofits phased stack by stack.
Documentation your board, counsel, and insurer can rely on.
Spec support, shop drawings, and submittals through construction administration.
Process
Walk-through, opening survey, and review of milestone or recertification reports.
Unit-by-unit scope, per-stack pricing, phasing plan, and renderings for the members' meeting.
Product approvals, structural calculations, and HVHZ permit submittals.
Stack-by-stack schedules with daily dry-in, protected interiors, and resident notices.
Threshold and final inspections closed out, with documentation packaged for the association.
For Boards
Scope narrative, phasing calendar, per-stack budget framework, insurance-credit summary, and sample resident notices — assembled in one PDF you can circulate before the vote.

Case Study — Monte Carlo Towers, Tampa
A waterfront high-rise on Bayshore Boulevard needed its impact glazing replaced without emptying the building. We surveyed the residences, built the phasing plan around the board’s schedule, and worked from swing stages over the water so no resident had to move out. Permitting, engineering, and installation were carried in-house, with daily dry-in, protected interiors, and notices issued unit by unit.

Phasing
Schedules are built stack by stack or floor by floor, with elevator and staging protocols, daily dry-in, protected floors and furniture, and resident notices issued unit by unit.

Send the milestone report, unit counts, or elevations. We will return a phasing plan, budget range, and a proposal your board can present.
SERVING FLORIDA